Task name: Improvement of accessibility to the junctions at the A4 motorway between Gogolin and Olszowa. Stage II.
Task 5. Construction of a ring road in Malnia and Chorula in the line of the voivodeship road no. 423 at the section of km20+846.46 to 27+010.10
Investor: Voivodeship Road Management Board in Opole
General Contractor: DROG-BUD Sp. z o.o. Częstochowa
Qualified Subcontractor: Nowak-Mosty sp. z o.o., Dąbrowa Górnicza
Scope regarding bridge industry:
– construction of the road flyover in the line of DW 423 over Malińska street (DW 424)
– construction of a retaining structure made of reinforced soil type Freyssisoil
Structure’s technical parameters:
A retaining wall made of reinforced soil type Freyssisoil
Obstacle(s): Malińska street (DW 424)
A retaining structure type Freyssisoil with the following parameters:
Obstacle(s): This retaining structure allows to route the designed municipal road along the existing escarpment by a deep gorge with a railway siding.
Delivery time: start date: 09/02/2018; end date: 31/12/2018