Task name: Construction of the Olszyce road junction in the line of the national road no. S1 at the crossroad with a county road, Zawiszy Czarnego street in Lędziny.
Investor: Goodman Delta Logistics (Poland)
General Contractor: Spec-Bruk sp. z o.o., s.k.
Qualified Subcontractor Nowak-Mosty sp. z o.o.
Scope:
– Demolition of the existing flyover.
– Construction of a new flyover with its load-bearing structure made of prefabricated T-shaped girders.
Structure’s technical parameters:
Four-span simple-supported load-bearing structure made of standard prefabricated pretensioned concrete type T18
The flyover is located in Lędziny in the line of Zawiszy Czarnego street.
load class – B acc. to PN-85/S-10030
Obstacle(s): national road no. S1 at km 559+260
Delivery time: start date: 18/04/2018; end date: 28/09/2018