Task name: Reconstruction of the railway bridge at km 12.461 in the line of Goleszów – Wisła over the Wisła River – Design and build.
Investor: PKP PLK S.A. Zakład Linii Kolejowych in Sosnowiec
Contractor: Nowak-Mosty Sp. z o.o.
Technical parameters of the new structure:
Structure: single-span truss, closed at the top, with traffic allowed on bridge sleepers
Total length: Lc = 40.75 m
Theoretical span length: Lt = 39.6 m
Total width: B = 5.39 m
Obstacle(s) – Wisła River
Scope regarding bridge industry:
The structure is located in the line of the railway line no. 191 Goleszów – Wisła, a national-level secondary single-track electrified line.
Delivery time: start date: 04/05/2017; end date: 27/12/2017