Task name: Demolition and construction of a new bridge across the Chechło River – Design.
Contracting Party: County Road Management Board in Chrzanów.
General Contractor: Nowak-Mosty Sp. z o.o.
Structure’s technical parameters:
Single-span framework composite structure, concrete and concrete (Kujan girders), non-piled foundation
Total length Lc – 32.24 m
Span length Lt: – 11.80 m
Flyover width, b – 10.66 m
Load class – C acc. to PN-85/S-10030
Obstacle(s): Chechło River
The structure is located in the line of the county road no. DP 1009K K in Mętków.
Scope:
– road traffic arrangement – bypass
– reconstruction of a medium pressure gas supply line – controlled directional drilling
– construction and demolition of a temporary pedestrian bridge
– demolition and construction of the road bridge
– construction and expansion of the bridge access roads
Delivery time: start date: 29/07/2019; end date: 15/11/2019