Task name: Construction of the bridge across the Ruda River in the line of DW 919 in Rudy.
Investor: Voivodeship Road Management Board in Katowice
General Contractor: Nowak-Mosty Sp. z o.o.
Demolition and construction of the bridge across the Ruda River in the line of DW 919 at km 23+177 in Rudy, along with a bypass bridge.
Structure’s technical parameters:
Structure: single-span simple-supported reinforced concrete, pre-stressed longitudinally and crosswise, reinforced with a steel arch girder
Non-piled foundation, large diameter piles with dia. 1200 mm
Total length: Lc = 38.48 m
Theoretical span length: Lt = 30.0 m
Total width: B = 14.0 m (span) B = 14.52 m (above supports)
Obstacle(s): Ruda River
Load class: A acc. to PN-85/S-10030 + Stanag
Scope:
The structure is located in the line of the voivodeship road no. 919, road class G.
Delivery time: start date: 03/12/2018; end date: 29/11/2019