Task name: Construction of an underpass across the railway track by the Pogoria III waterbody in Dąbrowa Górnicza.
Contracting Party: Dąbrowa Górnicza Municipality
General Contractor: Consultation: Nowak-Mosty/Complex Dąbrowa Górnicza
“Underpass across the track of the line no. 183” as a part of the Project: „Przebudowa układu komunikacyjnego wraz z wykonaniem nowych miejsc parkingowych w rejonie ul Malinowe Górki przy zbiorniku Pogoria III”:
Structure’s technical parameters:
Load-bearing structure: closed reinforced concrete framework
Total length Lc – 6.10 m
Width under the track: – 14.0 m
Clear width: – 5.0 m
Clear height: – 3.04 m
The structure is located between the Pogoria III waterbody and the Pogoria IV waterbody in Dąbrowa Górnicza, under the railway line no. 183.
Scope:
– Railway traffic arrangement
– Demolition of the track surface with its subsequent reconstruction
– Construction of an underpass as a monolithic reinforced concrete framework
– Reconstruction of a water supply system
– Reconstruction of a teletechnical system
– Construction of a rainwater sewage system
– Construction of underpass lighting with power supply line
– Construction of walkways and bikeways
Delivery time: start date: 29/10/2018; end date: 31/05/2018