Task name: Reconstruction of the road bridge in Sękowa – Design and build.
Contracting Party: Voivodeship Road Management Board in Kraków
General Contractor: Nowak-Mosty Sp. z o.o.
Structure’s technical parameters:
Single-span arch-based load-bearing structure with traffic at the bottom
Total length Lc – 70.8 m
Span length Lt: – 58.0 m
Bridge width, b – 17.32 m
Load class – A acc. to PN-85/S-10030
Obstacle(s): Sękówka River
The structure is located in the line of the voivodeship road no. DW 977 in Sękowa.
Technical parameters of the road DW 977:
Total length: 0.292 km
Road category: voivodeship road
Road class: G
Design speed limit: Vp = 60 km/h
Scope:
– road traffic arrangement – bypass – a bypass bridge
– demolition of the existing five-span bridge, with girder plate structure
– construction of a new bridge with arch-based pre-stressed reinforced concrete load-bearing structure with traffic at the bottom
– reconstruction of the road section no. 250, from km 1+120.00 to 1+222.00, and the road section no. 260, from km 0+000.0 to km 0+190.00
– reconstruction of a water supply system
– reconstruction of a gas supply system
– reconstruction of a teletechnical system
– reconstruction of a sanitary sewage system
– bridge lighting
Delivery time: start date: 12/09/2018; end date: 24/03/2020