Task name: Reconstruction of the railway flyover at km 72.612 as a part of the task: “Prace na linii kolejowej nr 96 na odcinku Tarnów – Muszyna”.
Contracting Party: PKP Polskie Linie Kolejowe S.A.- CRI Region Południowy.
General Contractor: Nowak-Mosty Sp. z o.o.
Civil works for the purpose of reconstruction of the railway flyover at km 72.612 as a part of the task: “Prace na linii kolejowej nr 96 na odcinku Tarnów – Muszyna”.
Structure’s technical parameters:
Structure: reinforced concrete framework, closed at the bottom, non-piling foundation
Total length: Lc = 13.60 m
Theoretical span length: Lc = 12.80 m
Total width: B = 20.40 m
Clear height: 4.74 m
Total width with wings: B = 39.14 m
Obstacle(s): county road no. 1574K in Ptaszkowa
Load class: K+2
Scope:
The engineering structures are located in the line of the railway line no. 096 Tarnów – Leluchów at km 72.612, a national-level single-track electrified line (rail tracks S49).
Delivery time: start date: 18/12/2018; end date: 02/11/2019