Task name: Renovation of the road culvert in the line of Kościelna street in Tarnowskie Góry – Build.
Investor: Tarnowskie Góry Municipality – MZUiM Tarnowskie Góry
General Contractor: Nowak-Mosty Sp. z o.o.
Technical parameters of the new structure:
Structure: plate structure made of reinforced concrete.
Structure’s technical parameters:
- Total length: Lc = 8.8 m
- Theoretical span length: Lt = 4.3 m
- Structure’s total width: 6.24 m
- Horizontal clearance gauge: 3.75 m
- Vertical clearance gauge: 1.81 m
Scope:
- Replacement of the existing span structure made of prefabricated girders with a reinforced concrete plate structure.
- Removal and restoration of lower strips made of reinforced concrete
- Superficial repair of supports and wings with injection of breaks and fractures
- Completion of a reinforced concrete sleeve on stone parts of the supports
- Replacement of balustrades with handrail barriers.
- Completion of asphalt surfaces.
- The structure is located in the line of Kościelna street in Tarnowskie Góry by the Stoła River.
Delivery time: 120 days after the site is handed over