Task name: Renovation of the bridge in the line of county road “Do Kruku” 200594KW at km 0+024 in Skrzyszów – Build.
Investor: Skrzyszów Municipality
General Contractor: Nowak-Mosty Sp. z o.o.
Structure’s technical parameters:
- Design: Load-bearing structure with static diagram of a simple-supported girder made of reinforced concrete prefabricated beams composited with reinforced concrete plate.
- total length Lc = 14.90 m
- theoretical span length Lt = 11.05 m
- Total width: = 6.00 m
- Obstacle(s) – Wątok River
Scope:
- protection of third party devices for the duration of renovation
- completion of a new asphalt surface on the bridge and its access roads
- demolition of the existing concrete superstructure and installation of a new one
- completion of a new background wall and wings
- completion of insulation made of heat welded tar paper
- completion of footway surfaces and passage plates
- re-profiling of concrete surfaces with PCC mortars
- anti-corrosion protection for all concrete surfaces
- completion of resin surfaces on footway surfaces
- installation of new bridge balustrades
The structure is located in Skrzyszów in the line of county road “Do Kruku”.
Delivery time: start date: 05/10/2017; end date: 15/12/2017.