Task name: Reconstruction of the voivodeship road no. DW 793.
Contracting Party: Voivodeship Road Management Board in Katowice
General Contractor: Consultation: Drog-Bud Sp. z o.o./Nowak-Mosty sp. z o.o.
Technical parameters:
Class G voivodeship road with supporting infrastructure.
Scope:
Part A – Task 1
Expansion of the voivodeship road no. 793 at the section Żarki – Myszków
- Reconstruction of a road section 5.4 km long, from Żarki to Myszków.
- Construction and expansion of the existing junctions.
- Construction of a road drainage system.
- Reconstruction of technical infrastructure: construction of a rainwater sewage system, reconstruction of a water supply system, reconstruction of a gas supply system, construction of a street lighting system and a power distribution system, reconstruction of a telecommunications network, construction of a service duct.
- Construction of road safety equipment;
- Reconstruction of the existing engineering structures, such as P1 and P3
P1 at km 3+198 – demolition and construction of a new structure
– closed monolithic reinforced concrete framework
– total length Lc = 13.7 m
– clear span between walls 4.0 m
– load class A + Stanag 2010
P3 at km 30+775.80 – demolition and construction of a new structure
– closed monolithic reinforced concrete framework
– total length Lc = 14.78 m
– clear span between walls 4.0 m
– load class A + Stanag 2010
Part A – Task 2
Construction of a sanitary sewage system at Kościuszki street and Żytnia street in Myszków, and construction of a road at Żytnia street along with rainwater sewage system, allowing access to designed wastewater pump station
- Construction of a sanitary sewage system (gravitational type and delivery type) in the right-of-way area with connectors and branch collectors to real properties or side roads with total length L = 2,815.1 m.
- Construction of wastewater pump stations PS1 and PS2
- Construction of supply lines for pump stations located downstream meters.
- Reconstruction of an MV cable.
- Reconstruction of the entry of the municipal road at Żytnia street to DW 793.
- Reconstruction of the water supply system and the power distribution system
Part B – Task 3
Reconstruction of the voivodeship road no. 793 at the section Janów – Złoty Potok.
- Reconstruction of a road section 2.1 km long.
- Reconstruction of existing technical infrastructure.
Delivery time: start date: 23/07/2017; end date: 30/10/2018.