Task name: Demolition of the existing bridge and construction of a culvert across ditch R-A in the line of the national road no. 12 in Wróblew.
Investor: GDDKiA Oddział w Łodzi
General Contractor: Nowak-Mosty Sp. z o.o.
Scope:
– demolition of the existing bridge.
– construction of a new steel culvert, made of corrugated galvanised steel plate
– reconstruction of the road surface on the culvert and its access roads
Structure’s technical parameters:
Road’s technical parameters:
The engineering structure is located in Wróblew in the line of the national road no. 12.
load class – A acc. to PN-85/S-10030
Obstacle(s): specific drainage ditch R-A-12
Delivery time: start date: 09/04/2018; end date: 30/09/2018