Task name: Modernisation of the railway flyover at the Siekierki Power Plant siding – Design and build.
Contracting Party: PGNiG Termika S.A.
General Contractor: Nowak-Mosty Sp. z o.o.
Modernisation of the railway flyover at the Siekierki Power Plant siding over Kobylańska street
in Warsaw.
Structure’s technical parameters:
Structure: simple-supported girder, concrete girder, non-piling foundation
Total length of the span: Lc = 13.60 m
Theoretical span length: Lt = 13.0 m
Total width: B = 5.50 m
Clear height: 4.74 m
Total width with wings: B = 39.14 m
Obstacle(s): Kobylańska street in Warsaw
Scope:
The engineering structures is located in the line of the Siekierki Power Plant siding at km 27.596
over Kobylańska street in Warsaw.
Delivery time: start date: 02/01/2019; end date: 20/12/2019