Task name: Construction of a structure at km 1.811 in the line of the line no. 153 in the scope of abutments with bases and passage zones.
Contracting Party: PKP Polskie Linie Kolejowe S.A.
General Contractor: PORR S.A.
Structure’s technical parameters:
Single-span load-bearing structure, plate girder with traffic at the bottom (deck closed), reinforced concrete abutments with non-piled foundation
Operating length: – 27.0 m
Span length Lt: – 26.4 m
Flyover width, b – 7.55 m
Obstacle(s): railway line no. 152
The structure is located in the line of the railway line no. 153.
Scope:
– earth works – excavation in sealed walls
– completion of strip foundations along with compositing with sealed walls
– completion of supports’ bodies and wings
– completion of insulation and anti-corrosion for concrete
– completion of drainage and base for abutments
– completion of passage zones
Delivery time: start date: 04/03/2019; end date: 30/06/2019