Task name: Demolition of the railway flyover at the line no. 131 at km 33.780 /access line to an inactive siding of Fabryka Maszyn i Urządzeń TAGOR in Tarnowskie Góry/ – Design and build.
Investor: PKP PLK S.A. Zakład Linii Kolejowych w Tarnowskich Górach
Contractor: Nowak-Mosty Sp. z o.o.
Structure’s technical parameters:
- Structure: girder plate, simple-supported girder
- Total length: Lc = 9.90 m
- Theoretical span length: Lt = 9.40 m
- Total width: No data.
- Obstacle(s): Hutnicza street in Tarnowskie Góry
Scope regarding bridge industry:
- Designs for the following industries: bridge, track
- Demolition of the existing span
- Demolition of Abutment 2
- Cutting down escarpments behind the abutment and reinforcement with gabion mesh
- Construction of a footway at the side of completed reinforcement
- Repair of the asphalt surface at the section of completed reinforcement, using gabion mesh
Delivery time: start date: 05/06/2017; end date: 12/06/2017