Task name: Construction of the bridge across the Rudawa River in Szczyglice.
Investor: Cracow County Road Management Board
General Contractor: Nowak-Mosty sp. z o.o.
Scope:
– construction of a new bridge with framework structure composited with steel beams
– reconstruction of a medium pressure gas supply line (PE) with length of 63.00 m
– reconstruction of access roads to the structure at the section 0.32 km long
Structure’s technical parameters:
Framework load-bearing structure composited with steel beams, a deck made of reinforced concrete plate
The bridge is located in Szczyglice by the Rudawa River.
Load class – A acc. to PN-85/S-10030
Obstacle(s): Rudawa River
Delivery time: start date: 21/06/2018; end date: 14/12/2018