Task name: Reconstruction of railway infrastructure at the Dąbrowa Górnicza Wschodnia and Dąbrowa Górnicza Strzemieszyce stations and along the route Dąbrowa Górnicza Wschodnia – Dąbrowa Górnicza Strzemieszyce as a part of the Project: “Prace na liniach kolejowych nr 62, 660 na odcinku Tunel – Bukowno – Sosnowiec Płd.”
Investor: PKP PLK S.A. Centrum Realizacji Inwestycji Region Śląski
General Contractor: Consortium: Torkol sp. z o.o., Mar-Bud sp. z o.o., Nowak-Mosty Sp. z o.o.
Scope: Design and reconstruction of the railway line no. 62 at the Dąbrowa Górnicza Wschodnia and Dąbrowa Górnicza Strzemieszyce stations and along the route Dąbrowa Górnicza Wschodnia – Dąbrowa Górnicza Strzemieszyce, track 1 at km 65.445 – 67.067, track 2 at km 65.496 – 69.714, track 4 at the Dąbrowa Górnicza Strzemieszyce station at km 68.605 – 69.490, along with railway traffic control equipment.
Scope regarding bridge industry:
– total structure length with wings – 62.50 m
– span length – 47.50 m
– theoretical span length – 21.30 m + 23.45 m
– designed height – 1.25 m
– obstacle – 5 tracks at the line no. 133, Łuszczaka street at Dąbrowa Górnicza Strzemieszyce station
– culverts – 1 pcs.
– flyovers – 1 pcs.
– bridges – 1 pcs.
The civil engineering structures are located in the line of the railway line no. 62 Tunel – Sosnowiec, double track electrified line.
Delivery time: start date: 25/06/2018; end date: 30/11/2019