Task name: Construction of the expressway S-7 Kraków – Rabka Zdrój at the section Lubień – Naprawa, starting at km 713+580 and ending at km 721+170.
Investor: GDDKiA Kraków
General Contractor: IDS-BUD S.A.
Qualified Subcontractor: Nowak-Mosty Sp. z o.o.
Structure’s technical parameters:
Design: two girder structures with box cross-section of pre-stressed concrete
Total length: Lc = 262.26 m and Lc = 259.68 m
Theoretical span length: Lt for each = 55.00 + 65.00 + 65.00 + 55.00 m
Total width: B = 14.40 m and B = 14.30 m
Obstacle(s): DK-7, service roads and unnamed watercourses
Road class at the structure: GP
Scope regarding bridge industry:
Delivery time: start date: 16/12/2016; end date: under construction.