Task name: Reconstruction of culverts for bridges – Design and build.
Contracting Party: Lubaczów Forest District
General Contractor: Nowak-Mosty Sp. z o.o.
Structure’s technical parameters:
Structure 1 – Dziewięcierz Forest District, Division 180A
Total length Lc 10.88 m
Horizontal clearance gauge 3.73 m
Vertical clearance gauge 1.26 m
Structure 2 – Dziewięcierz Forest District, Division 185B
Total length Lc 15.68 m
Horizontal clearance gauge 3.73 m
Vertical clearance gauge 1.26 m
Structure 3 – Polanka Forest District, Division 81
Total length Lc 14.48 m
Horizontal clearance gauge 2.39 m
Vertical clearance gauge 1.30 m
Structure 4 – Nowa Grobla Forest District, Division 151
Total length Lc 16.28 m
Horizontal clearance gauge 2.40 m
Vertical clearance gauge 1.20 m
Structure 5 – Nowa Grobla Forest District, Division 155
Total length Lc 13.28 m
Horizontal clearance gauge 4.78 m
Vertical clearance gauge 1.62 m
Obstacle(s): waterways
Structure located in the lines of forest roads.
Technical parameters of stone aggregate forest road:
Total length: 0.04+0.04+0.04+0.03+0.08 = 0,230 km
Road category: forest road
Road class: D
Traffic category: KR-1-2
Scope:
– demolition of the existing culverts;
– completion of new bridges – corrugated steel plate spans
– completion of reinforcement of end walls with a riprap
– restoration of the beds of water streams and their reinforcement if applicable
– completion of access roads with stone aggregate surface
– completion of handrails on the structure and its access roads
Delivery time: start date: 09/08/2018; end date: 06/05/2019