Task name: “ZAPROJEKTOWANIE I WYKONANIE ROBÓT DLA PRZEBUDOWY 11 OBIEKTÓW INŻYNIERYJNYCH W CIĄGU LINII KOLEJOWEJ NR 62 NA ODCINKU TUNEL – WOLBROM W RAMACH PROJEKTU „PRACE NA LINIACH KOLEJOWYCH 62, 660 NA ODCINKU TUNEL – BUKOWNO – SOSNOWIEC PŁD”.
Contracting Party: PKP PLK S.A.
General Contractor: Nowak-Mosty Sp. z o.o. (Consortium Leader), Firesta – Fišer, rekonstrukce, stavby a.s. (Consortium Partner)
Scope of Task 1:
The subject matter of the contract includes development of detailed designs and the following:
1) demolition and construction of the flying junction at km 6.786 with supporting track works and road works;
2) demolition of the bridge and construction of a culvert at km 9.674 with supporting track works;
3) demolition and construction of the flying junction at km 13.985 with supporting track works and road works.
Scope of Task 2:
The subject matter of the contract includes development of detailed designs and the following:
1) reconstruction of a brickwork culvert at km 3.200 with supporting track works;
2) reconstruction of a brickwork culvert at km 3.598 with supporting track works;
3) reconstruction of a brickwork culvert at km 4.821 with supporting track works;
4) reconstruction of a partially prefabricated brickwork culvert at km 5.580 with supporting track works;
5) reconstruction of a brickwork culvert at km 6.055 with supporting track works;
6) reconstruction of the solid plate flying junction at km 6.486 with supporting track works and road works;
7) reconstruction of a partially prefabricated brickwork culvert at km 9.132 with supporting track works;
8) reconstruction of a brickwork culvert at km 11.643 with supporting track works.
The civil engineering structures are located in the line of the railway line no. 62 at the section Tunel – Wolbrom. This is a national-level double-track electrified line. The structure at km 13.895 is also located in the line of the railway line no. 65 (LHS).
Delivery time: start date: 31/08/2020; end date: 30/11/2023