Task name: Reconstruction of the railway bridge at km 2.528 at the railway line no. 136 Kędzierzyn Koźle – Opole Groszowice across the Gliwicki Canal.
Contracting Party: PKP PLK S.A. in Warsaw.
General Contractor: PORR S.A.
Qualified Subcontractor: Nowak-Mosty Sp. z o.o.
Structure’s technical parameters:
Structure: continuous four-span girder, span structure made of plate girders with alternate height topped with reinforced concrete plate
Supports: reinforced concrete, with prefabricated piling foundation
Total length: – 80.97 m
Span length Lt: – 14.2+25.0+26.3+14.2
Designed height: – 2.61m to 2.59m
Total width: – 10.92 m
Obstacle(s): Gliwicki Canal
Structure located in the line of the railway line no. 136 Kędzierzyn Koźle – Opole Groszowice
Scope:
– demolition of the existing load-bearing structure and construction of a new one
– renovation and reinforcement of the existing supports
Delivery time: start date: January 2020; end date: 05/01/2021