Task name: Reconstruction of the railway bridge at km 0.539 at the railway line no. 136 / at km 64.701 of the railway line no. 137, across the Kłodnica River
Contracting Party: PKP PLK S.A. in Warsaw.
General Contractor: PORR S.A.
Qualified Subcontractor: Nowak-Mosty Sp. z o.o.
Structure’s technical parameters:
Structure: continuous six-span girder, alternate girder structure, reinforced concrete plate, concrete-coated steel girder plate
Supports: reinforced concrete, with prefabricated piling foundation
Total length: – 66.85 m
Span length Lt: – 10.7+11.1+11.1+11.1+11.1+10.7m
Designed height: – 1.65 m
Total width: – 11.85 m
Obstacle(s): Kłodnica River and a dirt road
Structure located in the line of the railway line no. 136 and no. 137
Scope:
– demolition and construction of a new railway bridge
Delivery time: start date: January 2020; end date: 18/08/2020