Task name: Repair of the drainage system and rectification of bearings at railway flyovers at the railway line no. 1 Warszawa – Katowice.
Investor: PKP Polskie Linie Kolejowe S.A., Zakład Linii Kolejowych w Sosnowcu
General Contractor: Nowak-Mosty Sp. z o.o.
Structure’s technical parameters:
- Total length: Lc = 36.04 m and Lc = 28.10 m
- Theoretical span length: Lt = 6.40 + 2 x 11.20 + 6.40 m and Lt = 5.45 + 2 x 8.20 + 5.45 m
- Total width: B = 60.41 m and B = 68.02 m
- Line category: central electrified line.
- Structure: riveted girder plate with trough plate deck, laid upon steel poles – suspension arms and solid abutments.
Scope regarding bridge industry:
- Repair of the drainage system and rectification of bearings at km 318.591 at the railway line no. 1 Warszawa – Katowice over Św. Jana street in Katowice.
- Repair of the drainage system and rectification of bearings at km 318.077 at the railway line no. 1 Warszawa – Katowice over Św. Jana street in Katowice.
Delivery time: start date: 22/08/2016; end date: 30/12/2016