Task name: Reconstruction of two bridges located in the line of the county road no. 3925E in Gosławice.
Investor: Radomsko County
General Contractor: Nowak-Mosty Sp. z o.o.
Structures’ technical parameters:
Bridge at km 9+722
- Load class: A
- Road class: L
- Total length: Lc = 12.9 m
- Theoretical span length: Lt = 5.25 m
- Horizontal clearance gauge under the structure 60 m
- Vertical clearance under the structure: 1.7 m
Bridge at km 9+978
- Load class: A
- Road class: L
- Total length: Lc = 12.3 m
- Theoretical span length: Lt = 4.65 m
- Horizontal clearance gauge under the structure 00 m
- Vertical clearance under the structure:
Scope:
- Total demolition of the structures.
- Completion of reinforced concrete structure.
- Completion of passage plates.
- Completion of footway surfaces.
- Completion of insulation plates on the deck and footway surfaces.
- Laying down roadway surface on structures and access roads, along with expansion joints
- Installation of relevant equipment.
The structures are located in the line of the county road no. 3925E in Gosławice, at km 9+722 and km 9+978.
Delivery time: start date: 03/08/2017; end date: 29/09/2017