Task name: Construction of a transfer centre in the area of the PKP Centrum railway station, along with construction of supporting transport system, as a part of the Project: “Promowanie zielonej mobilności na terenie gminy Dąbrowa Górnicza”, Stage I and Stage II, and reconstruction of railway and road infrastructure in the region of the Dąbrowa Górnicza railway station, including removal of railway crossing in cat. A at km. 299.522 of the railway line no. 1 in the line of Konopnicka street, construction of a railway flyover/road tunnel between Kościuszki street and Limanowskiego street, and construction of an underground passage across the railway track connecting railway platforms with the railway station building and the transfer centre, as a part of the Project: “Poprawa bezpieczeństwa na skrzyżowaniach linii kolejowych z drogami”, Stage I
Contracting Party: Dąbrowa Górnicza Municipality, PKP PLK S.A.
General Contractor: Nowak-Mosty Sp. z o.o. (Consortium Leader), Complex Dąbrowa Górnicza Sp. z o.o. (Consortium Partner)
Scope of works to be completed for Dąbrowa Górnicza Municipality under the “Build” service:
– road industry – construction of a ring road connecting Sobieskiego street with Kościuszki street
– road industry – reconstruction of the road system in the area of Kościuszki, Kolejowa, Limanowskiego, Robotnicza and Korzeniec streets
– road industry – construction of car parks and bicycle parking areas
– bridge industry – construction of the WD-1 flyover over a railway siding providing access to Huta Bankowa
– bridge industry – construction of the WD-2 flyover over utilities networks
– bridge industry – construction of the PP-01 underground passage replacing existing railway crossing in the line of Konopnicka street
– construction industry – construction of retaining walls marked ŚO-1, ŚO-2 and ŚO-3
– telecommunications industry – construction of service ducts, reconstruction of teletechnical networks, construction of a traffic control system
– power distribution industry – reconstruction of LV and MV systems, construction of road lighting
– sanitary industry – reconstruction of medium- and high-pressure gas supply lines
– sanitary industry – reconstruction of water supply line
– sanitary industry – construction of a rainwater sewage system
– sanitary industry – construction of a sanitary sewage system
– sanitary industry – reconstruction of a central heating system
Scope of works to be completed for PKP PLK S.A. under the “Design and build” service:
– development of design documentation
– track industry – reconstruction of a track system along with drainage – railway line no. 1
– platform industry – reconstruction of the platform system with development of platform equipment at the Dąbrowa Górnicza railway station
– bridge industry – construction of a railway flyover/road tunnel at km 300.009, connecting Kościuszki street and Limanowskiego street
– bridge industry – construction of an underground passage at km 300.094 providing access to the Dąbrowa Górnicza station platforms
– power distribution industry – construction of the electric heating system for railways switches, construction of the station’s external lighting system, construction of the station’s platform lighting system, power supply and lighting system for the underground passage
– telecommunications industry – construction of telecommunications equipment, reconstruction of teletechnical cables
– railway traffic control industry – reconstruction of the railway traffic control equipment at the station and at the route
– catenary system industry – reconstruction of a catenary system
– acquisition of relevant EC verification certificates for each structural sub-system
Delivery time:start date: 10/08/2020; end date: 21/03/2023