Task name: Reconstruction of Aleja Wojska Polskiego street – DK1 (national road no. 1) in Częstochowa – Design and build.
Contracting Party: Municipal Road and Transport Management Board in Częstochowa.
General Contractor: Consultation: Drog-Bud Sp. z o.o., Firesta – Fiser, Nowak-Mosty Sp. z o.o.
Technical parameters of the DK-1 road:
Technical class – GP
Traffic category – KR7
Design speed limit – 70km/h
Scope:
- The subject matter of the contract is design and completion of reconstruction of Aleja Wojska Polskiego street in Częstochowa. This project includes a section of Aleja Wojska Polskiego street with length of ca. 5.5km from the Jana Pawła II street junction (excluding the junction) to the Rakowska street junction (including the junction):
- reconstruction of a section of DK-1 with bitumen surface
- reconstruction of junctions (intersections and interchanges) in the line of DK-1, including construction of grade-separated junctions: DK-1 with Legionów street, DK-1 with Krakowska street and Rejtana street
- reconstruction of bridge structures in the line of DK-1
- construction of roundabouts
- reconstruction of footways, foot and bicycle ways, bus turnouts, access roads to real properties
- reconstruction of the land drainage system, including any road drainage equipment
- reconstruction of the road lighting system
- construction of environment protection equipment: noise barriers, greenery
- reconstruction of conflicting devices and systems within the existing above-ground and underground infrastructure: teletechnical and power distribution equipment, power supply system, rainwater and sanitary sewage systems, gas supply systems, central heating system, drainage and hydrological equipment
- construction of a service duct for the purpose of telecommunications system and sewage system for the road infrastructure
Scope regarding bridge industry:
- flying junctions over Wesoła street – demolition and construction of 2 new structures with load-bearing capacity class A
- flying junctions over Papierowa street – demolition and construction of 2 new structures with load-bearing capacity class A
- an elevated slip road over Legionów street, construction of a new structure with load-bearing capacity class A
- flying junctions over a railway siding – revitalisation of 2 bridge structures
- the pedestrian bridge across the Warta River – structure reconstruction
- bridges across the Warta River – demolition, construction of an elevated slip road with its span over Warta River
- bridges across the Warta River – construction of 2 bridges in the line of the access road
- the pedestrian bridge over PKP site – revitalisation
- the pedestrian bridge at Stroma street – reconstruction
- the pedestrian bridge at Prosta street – reconstruction
- the pedestrian bridge at Sieroszewskiego street – reconstruction
- an elevated slip road over Aleja Pokoju street – demolition and construction of a new structure with load-bearing capacity class A
- the pedestrian bridge at Okrzei street – reconstruction
- the pedestrian bridge at Mireckiego street – demolition and construction of a new pedestrian bridge
- flying junctions over Rakowska street – revitalisation
Delivery time: start date: 27/09/2018; end date: 31/10/2022