Task name: Design and construction of a bridge across an unnamed water stream in Brzegi Dolne, in the line of national road no. 84 Sanok – Krościenko – state border at km 42+432 along with reconstruction of access roads, completion of stream bed modification, reconstruction of existing utilities networks conflicting with the designed project.
Investor: GDDKiA Oddział Rzeszów
General Contractor: Nowak-Mosty Sp. z o.o.
Scope:
RECONSTRUCTION OF THE ROAD SECTION ON ACCESS ROADS
Road’s technical parameters:
RECONSTRUCTION OF THE STRUCTURE
Reinforced concrete flyover, one-span framework structure with non-piled foundation
Structure’s technical parameters:
The engineering structure is located in Brzegi Dolne in the line of the national road no. 84.
road class – G, load class – A acc. to PN-85/S-10030
Delivery time: start date: 05/01/2018; end date: 30/09/2018